Week 3 Update

Concrete work continues to be the focus of the last week. The outdoor classroom seating wall and caps have been poured and the stamped circle pad in front of the wall was poured today. The walls will be covered in a stone veneer in the coming weeks. Concrete walkways have been expanded to beyond the eastern Observatory door and another large pour is scheduled for tomorrow to expand the walkway past the western door on that side of the building. Once the demolition and reconstruction of the steps on the backside of the building is complete the walkway will connect there and to the future sport court. Walkways from the Observatory sidewalk will also be poured over the next week or two. Once that is finished we will start to see topsoil added to the landscape and grass lawn areas in preparation for planting.